Attraction in Tanzania
Nyakhanazi
About Nyakhanazi
Nyakhanazi is identified as a populated place located in Tanzania, specifically within the Biharamulo District of the Kagera Region. Its geographical coordinates are approximately 3° 02' 23" S latitude and 31° 12' 32" E longitude. This location is recognized as a significant point within the country's administrative divisions.
The area is notably characterized by its crucial power infrastructure, housing the Nyakanazi Power Substation. This substation is an integral component of Tanzania's North West Grid, playing a vital role in the transmission of electricity across the region. The facility currently operates with three main transmission lines, each designed for 220 kilovolts (kV), with future plans for expansion to increase each line's capacity to 400 kV. These lines facilitate power flow to key areas: one transmits electricity to Geita, connecting to the national grid; another receives power from the Rusumo Power Plant; and the third is responsible for supplying electricity to Kigoma. The planned expansion aims to achieve full national grid interconnection, thereby ensuring a consistent and reliable power supply to regions that might otherwise depend on cross-border electricity, such as Sumbawanga in the Rukwa Region. The substation is equipped with two transformers, each with a capacity of 40 megavoltamperes (MVA), which step down the voltage from 220 kV to 33 kV for local distribution.
The Nyakanazi substation's reach extends broadly, distributing power to seven districts across three distinct regions. These include Ngara and Biharamulo districts in the Kagera Region, Chato, Bukombe, and Mbogwe districts in the Geita Region, and Kakonko and Kibondo districts in the Kigoma Region. As the primary substation receiving power from the Rusumo generation plant, it handles an average of 27 megawatts (MW) from Rusumo, with approximately 19 MW consumed within the connected districts and the remaining surplus fed into the national grid. The upgrade project for the Nyakanazi Substation is anticipated to be commissioned in 2035, backed by an estimated $26.85 million in financing from authorities. Upon completion, the substation is projected to have a capacity of 750MVA, with a designed and operating voltage level of 400/220kV, featuring a 400kV step-in voltage and a 220kV step-out voltage.