
Nyakanazi is a populated place situated in the Kagera Region of Tanzania, specifically within the Biharamulo District and the Lusahunga area. It is located at an elevation of approximately 1245 meters (4084 feet) above sea level. Geographically, Nyakanazi's coordinates are approximately 3° 02' 23" S latitude and 31° 12' 32" E longitude. The place is roughly 201.4 kilometers (125.1 miles) from Bukoba, which serves as the regional capital of Kagera, and about 611.1 kilometers (379.7 miles) from Dodoma, the capital city of Tanzania.
Nyakanazi holds a significant position within Tanzania's national power infrastructure due to the presence of a crucial 400kV power substation. This substation is instrumental in enhancing the integration of the national power grid and improving access to reliable electricity services across the region. The facility currently operates three primary transmission lines, each with a capacity of 220 kilovolts (kV), with plans for expansion to 400 kV. One of these lines transmits power to Geita, connecting it to the national grid; another receives electricity from the Rusumo Power Plant; and the third supplies power to Kigoma. The substation is equipped with two transformers, each capable of 40 megavoltamperes (MVA), which step down the voltage from 220 kV to 33 kV for local distribution. It serves a wide area, distributing power to seven districts across three regions: Ngara and Biharamulo in Kagera Region, Chato, Bukombe, and Mbogwe in Geita Region, and Kakonko and Kibondo in Kigoma Region. The station receives an average of 27 megawatts (MW) from the Rusumo plant, with approximately 19 MW consumed locally and the surplus fed into the national grid. A major expansion project for the Nyakanazi Power Substation is anticipated to begin in 2034 and be commissioned in 2035, with an estimated investment of $26.85 million.
Own this place?
Claim it to update its details and photos, add what you offer, reply to travellers and promote it on Wapota. It’s free.
Claim this listing →